Legacy Modernisation
Old systems brought forward without a rewrite — stabilised, sped up, and made safe to change again.
// WHAT'S INCLUDED
- [01]
PHP 8 compatibility migration
- [02]
Dependency and security audit
- [03]
Incremental refactor plan
- [04]
Test harness for untested code
- [05]
Deployment pipeline
// DETAIL
Ten years of PHP is not a liability
If your PHP application has been running the business for ten years, it is not a liability. It is the most complete description of how the business works that exists anywhere. We treat it that way. Tests around the parts that earn money, a dependency audit, then small reversible changes while it stays in production. Most “we need a rewrite” conversations end with us recommending you don’t.
Upgrading to PHP 8
We run compatibility analysis across the codebase, fix the breaking changes in reviewable batches, and keep the application deployable the entire time.
New PHP work
When we start fresh, we write PHP that a mid-level developer can read. Explicit types, thin controllers, and no magic that has to be explained in a handover call.
When the system is PHP
Ageing systems are more often written in PHP than anything else. PHP has its own page covering version migrations, security audits and framework-free codebases: PHP development services. If the destination is a modern framework, that is usually Laravel.
Modernising the surface without touching the engine
A dated interface is often the reason a working system gets condemned. Where the PHP application is sound, the cheaper route is to leave it running. Expose the parts that matter behind an API, then put a new front end on top — including a genuinely 3D one. The business logic that took a decade to get right stays where it is, and the risk stays proportional to the change.
The assessment, and what is in it
Modernisation starts with a fixed-price assessment rather than a proposal, because nobody can quote for a system they have not read. You receive a written document: a map of what the architecture actually is, as opposed to what the original diagram said; a register of the risks that matter, separated from the things that are merely ugly; a dependency audit with the end-of-life dates; what each upgrade path costs; and what we would do in the first month. The document is yours whether or not you continue with us.
Recording what it does before changing it
Old systems are full of behaviour that looks like a bug and is in fact the reason the accounts have reconciled for a decade. So before changing anything we write characterisation tests: they record what the system does today, for the paths that earn money, without judging whether it should. Those tests are what make the next step safe. A change that alters recorded behaviour fails a test, and someone decides whether that was the point.
Replacing it a route at a time
The rewrite that works is the one nobody notices. New code takes over one route, one job or one module at a time, with the old code still there behind it until the new path has run in production long enough to be trusted. Each step is small enough to reverse in minutes. The business keeps running throughout, and the day the last of the old code is removed is an ordinary Tuesday.
// QUESTIONS WE GET ASKED
Rewrite or modernise?
Modernise, almost always. A rewrite throws away the one complete description of how your business works and spends a year rebuilding it from memory. Modernisation keeps the system in production, puts tests around what earns money, and replaces the parts that need replacing in small reversible steps. A rewrite is right only when the platform itself is gone — an unsupported runtime with no path forward.
How long does it take?
It depends on what the assessment finds, which is why the assessment comes first. The useful answer is that the system stays in production throughout, value arrives from the first month rather than at the end, and there is never a point where the business is waiting on a big switch-over date.
Can you work on our existing hosting?
Usually, yes. Where the hosting itself is the risk — an unsupported operating system, no way to deploy without downtime — moving it is one of the recommendations in the assessment, with the cost and the sequence written down.
Will the business notice?
Only in the ways it should: pages get faster, errors get rarer, changes that used to take a quarter take a week. Each change is small and reversible, and the old behaviour is recorded in tests, so a difference anyone does notice is a difference we chose.
// TYPICAL STACK
// RELATED SOLUTIONS
// FURTHER READING
// LET'S BUILD
START APROJECT
